Lbl-lighting MO Adjustable Vertical Connector Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Oświetlenie Lbl-lighting MO Adjustable Vertical Connector. LBL Lighting MO Adjustable Vertical Connector User Manual [de] Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 4
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
Installation Instructions for
Adjustable Cable Standoffs
1.3
HANGER-CBL-_
980MRLASP
1
Install the Adjustable Cable Standoffs
GP I :ENERAL RODUCT NFORMATION
This product is suitable for indoor dry locations only.
This product must be used with LBL Monorail system only.
This instruction is for the following models:
Monorail Cable Support 6' (HANGER-CBJ-_6)
Monorail Cable Support 8' (HANGER-CBJ-_8)
Monorail Cable Support 18' (HANGER-CBJ-_18)
Monorail Cable Support 25' (HANGER-CBJ-_25)
ANCHOR
Select a location on the ceiling where the Monorail is to be
mounted.
One way of marking the standoff locations on the ceiling is to
lay the Monorail on the floor underneath of the selected
location and by using a plumb bob pointing on the center of
the Monorail, mark the points on the ceiling.
The other way is to hold the Monorail directly against the
ceiling and mark the standoff points on the ceiling.
Tap the anchors at the marked points up to the threaded
portion with a hammer.
Insert the #8 screw into the threaded nipple and washer.
Tighten the #8 screw completely into the anchor to secure the
washer and threaded nipple.
Repeat step 4 through 6 for the remaining standoffs.
CEILING
Screw the anchors in the rest of the way with a Phillips
screwdriver.
ANCHOR
WASHER
#8 SCREW
THREADED NIPPLE
Monorail
1B
1A
1
2
3
4
6
5
4
6
1B
1A
5
7
1B1C
Przeglądanie stron 0
1 2 3 4

Podsumowanie treści

Strona 1 - Adjustable Cable Standoffs

Installation Instructions forAdjustable Cable Standoffs1.3HANGER-CBL-_980MRLASP1Install the Adjustable Cable StandoffsGP I :ENERAL RODUCT NFORMATIONTh

Strona 2 - Install the Monorail

2Screw the cable post completely to the threaded nipple.CABLE POSTTHREADED NIPPLEFeed the aircraft cable through the cable grip by pushing thetab down

Strona 3

3If necessary (depending on design) rotate the Monorail to thedesired angle or horizontal position.Tighten the two M3 set screws on housing with the 1

Strona 4 - SAVETHESE INSTRUCTIONS!

3SAVETHESE INSTRUCTIONS!7400 Linder Ave, Skokie, IL 60077800.323.3226 - 847.626.6300www.lbllighting.com© 2014 LBL Lighting.All rights reserved.The &

Komentarze do niniejszej Instrukcji

Brak uwag